Orono, Maine

APEX designed and issued specifications for a 650kW Steam/Turbine Generator set for the University. This generator provides energy to the campus. 

The scope of services was separated into four phases. Phase I consisted of pipe stress analysis and hanger design. Phase II included the design and specification of a new De-superheater. Engineering and specifications of piping specialties made up the scope of Phase III, and lastly, Phase IV involved line size review and material selection.

 

Client: University of Maine

Contact: Stewart Harvey, Facilities Director (207) 581-2668

Completion Date: June 2009